GSA MAS Refresh 34: Read This Before You Accept the Mod

Nov 17, 2026

GSA MAS Refresh 34: Overall Changes and SIN-Specific Impacts

Quick answer: GSA MAS Refresh 34 (solicitation 47QSMD20R0001, attachment created November 12, 2026) incorporates GSAR Overhaul Wave 4, a new AI data clause, an optional domestic end product certificate, and nitrile glove removals. It also changes two SINs: 561210FAC (Facilities Support Services) and 54151HACS (Highly Adaptive Cybersecurity Services). Contractors must accept the mass modification no later than 90 days after GSA issues it.

GSA MAS Refresh 34 is more than a routine clause update. It rewrites the contract terms that govern pricing data, sales criteria, team arrangements, audits, and cancellation. For many contractors, the real work is checking each new clause against how they operate today.

When Must You Accept GSA MAS Refresh 34, and Which Orders Does It Cover?

The SF30 sets two rules that drive your timeline:

  • Acceptance: You must accept the mass modification no later than 90 days after GSA issues it. Counted from November 12, 2026, that is February 10, 2027. Confirm against the issue date on your own SF30.
  • Scope: The changes apply to all new task and delivery orders issued after the modification’s effective date. That includes orders placed under existing BPAs. Orders issued earlier stay under their original terms.

Do not treat 90 days as slack. Under new clause 552.238-191(h), failing to accept a mass modification by the designated date may result in your pricing and catalog data being temporarily removed, or in contract cancellation.

What Does GSA MAS Refresh 34 Change Overall?

Refresh 34 revises the SCP-FSS-001 instructions to reflect three updates:

  1. GSAR Overhaul Wave 4, covering GSAR Parts 538 and 539.
  2. GSA Class Deviation CD-2026-04 on FSS domestic end product certification.
  3. An OMB memorandum on covered nitrile gloves.

Wave 4 modernizes the FSS program through what GSA calls “evergreen contracting.” The SF30 lists these headline changes:

  • No more 20-year cap: GSA removes the 20-year limit on contract duration.
  • Clause consolidation: GSA deletes 41 GSAR provisions and clauses and removes eight FAS FSS clauses. It adds five new GSAR clauses, 552.238-190 through -194.
  • Ordering procedures unchanged: Wave 4 made no revisions to the FSS ordering procedures in GSAR subpart 538.71. Those came through Refresh 30 and are still moving through rulemaking.

Seventeen clauses remain in the consolidated set. They include Alternate I of 552.516-90 (Economic Price Adjustment, previously 552.238-120), plus 552.238-77, -79, -80, -82, -83, -112 through -117, and -190 through -194.

Which New Clauses Change Day-to-Day Contract Management?

Clause What it says What to check
552.238-116 GSA may extend the contract up to 5 more years, with no limit on how many times, by written notice 30 days before expiration Your long-term pricing and catalog plan
552.238-194 The contracting officer may decline to extend if sales are not expected to exceed $100,000 in the first 60 months, and $125,000 in each 60-month period after Your sales history against the retired I-FSS-639 criteria
552.238-190 FSS CTAs are not joint ventures or subcontracts; the ordering activity has privity with each member Each member reports sales and remits fees for its own work
552.238-191 Requires a named contract administrator and covers prompt payment discounts, price reductions, and Section 508 Your designated contact is current
552.238-77 Failure to comply can trigger temporary removal of pricing data for up to 90 days, extendable by 30 Catalog accuracy in GSA’s designated platform
552.238-79 Either party may cancel on 30 calendar days’ notice Wind-down obligations on open orders
552.238-83 GSA may examine records until 3 years after final payment Your retention schedule

Two further changes deserve a closer look:

  • Transactional data and fees (552.238-80): The clause lists 23 required data elements. An unpaid contract fee becomes a debt to the government if you do not remit it within 30 calendar days after the reporting period ends. GSA can change fee amounts or data elements effective 60 days after notice.
  • Price adjustment (552.238-117): GSA treats information as current, accurate, and complete if it was so as of 14 calendar days before submission. Price reductions can reach back to payments already made, with interest.

What Does the New AI Clause Require?

Clause 552.239-7001, Basic Safeguarding of Data within Large Language Model Artificial Intelligence Systems, is new in Refresh 34. Start with applicability. It applies only when the government is buying an LLM or similar system where LLM functionality is a material feature and Government Data goes directly into it. It is self-deleting when LLM use stays inside your internal business systems.

When it applies, expect these obligations:

  • Data ownership: The government owns Government Data and Custom Developments. You keep the underlying LLM and background data.
  • Prohibited uses: No training or fine-tuning on Government Data, and no use to inform your marketing or business decisions.
  • Reporting: Notify the contracting officer within 72 hours of learning of a material violation.
  • Disclosure and flowdown: Disclose the LLMs you use and flow requirements down to subcontractors performing AI design, development, deployment, or operation tasks.
  • Data handling: Keep data inside agreed or FedRAMP-authorized services, segregate it from commercial customer data, and delete it, including fine-tuned weights and embeddings, at contract end.

Existing artifacts such as model cards, FedRAMP packages, SOC 2 reports, and ISO 27001 materials can satisfy due diligence. You do not need to create duplicate documentation.

What Changed for Resellers and Supply Chain Compliance?

Clause 552.238-193 applies to resellers and distributors, not to manufacturers selling their own products. It bars you from offering products without authorization or against a manufacturer prohibition. If a manufacturer runs an authorized supplier or controlled distribution program, you must be in it. GSA relies on manufacturer-provided information to verify this.

If GSA finds a discrepancy, the contracting officer notifies you in writing. You have 30 days to respond unless the notice sets a different time. Failure to resolve it may lead to termination or cancellation. This aligns with GSA’s July 1, 2026 reminder on order fulfillment and manufacturer authorization.

Clause 552.240-71, Supply Chain Risk Monitoring, also appears. The SF30 lists it as added under number 552.240-71 and as deleted under the earlier number 552.540-71, with the same title and July 2026 date. If you tracked the earlier number in your compliance matrix, update the reference. Where risks cannot be reasonably mitigated, remedies include:

  • Removal of the product, service, or solution from the contract
  • Not extending contract performance
  • Contract cancellation or termination

What Is the FSS Domestic End Product Certificate?

Clause 552.238-130 lets you certify that listed products are FSS domestic end products. Certification is permitted, not required. A product qualifies if all of these hold:

  • It is offered on your FSS contract.
  • It is manufactured in the United States.
  • If it is not predominantly iron or steel, U.S. component costs exceed 75 percent of total component costs.
  • If it is predominantly iron or steel, foreign iron or steel costs are under 5 percent of total component costs.

The certification is a material representation. A knowingly erroneous certification can bring False Claims Act remedies. Resellers acting in good faith may rely on OEM information and commercially reasonable efforts.

GSA is still seeking OMB clearance for the related information collections. Until clearance arrives, you may submit the certification, but GSA will not enforce compliance or share the information.

What Happens to Nitrile Gloves on MAS?

Following an OMB memorandum dated August 31, 2026, GSA intends to remove items that fall within the scope of DHS’s Best-in-Class PPE Safety Stock contract for domestically manufactured nitrile gloves. The SF30 names powder-free, medical-grade gloves in 4 mil and 5 mil blue and a 6 mil black variety. GSA says it will engage affected contractors to validate scope and consider feedback before removing anything.

Which SINs Does GSA MAS Refresh 34 Affect?

The SF30 lists two SIN-specific changes. It shows no added SINs, no deleted SINs, and no vendor fill-in clause changes.

SIN 561210FAC, Facilities Support Services (Facilities B, subcategory B01)

  • GSA removes the HVAC Maintenance subgroup (Boilers, Chillers, Refrigeration, etc.).
  • GSA will not award MAS contracts to offerors that only offer service types such as janitorial, plumbing, electrical, or HVAC maintenance, which Complete Facilities Maintenance contractors can perform.
  • The note still lists allowable standalone services. These are HVAC services with a technical response showing boiler, chiller, and refrigeration experience, fire alarm and fire suppression maintenance, and elevator and escalator inspection and maintenance.
  • The summary line and the note text read differently on HVAC. Read the SIN note in your own modification before you decide how to position.

SIN 54151HACS, Highly Adaptive Cybersecurity Services (IT Services, F05)

  • GSA is phasing out the voluntary Incident Response subgroup at the end of Fiscal Year 2027.
  • If you hold the Incident Response subgroup but not Incident Handling and Event Management (IHEM), evaluate your eligibility and request IHEM placement. IHEM incorporates incident response capabilities.
  • Start early. Do not wait for the phase-out to approach.

What Should You Do Before Accepting GSA MAS Refresh 34?

  1. Calendar the deadline. Work backward from 90 days after the issue date on your SF30.
  2. Name your contract administrator and notify the FSS contracting officer in writing.
  3. Test your sales against the 552.238-194 thresholds.
  4. Audit reseller authorizations against each manufacturer’s authorized supplier program.
  5. Map your AI use to see whether 552.239-7001 applies to any product or order.
  6. Review CTA agreements against 552.238-190 and confirm fee and data reporting duties.
  7. Check your SIN notes for 561210FAC or 54151HACS impacts, and the nitrile glove list if you sell PPE.

Frequently Asked Questions

When is the GSA MAS Refresh 34 acceptance deadline?
You must accept the mass modification no later than 90 days after GSA issues it. Counted from November 12, 2026, the date on the attachment, that is February 10, 2027. Confirm against the issue date on your own SF30.

What happens if I do not accept the Refresh 34 mass modification?
Under clause 552.238-191, failure to accept by the designated date may result in your pricing and catalog data being temporarily removed or your contract being cancelled.

Does Refresh 34 apply to existing orders?
No. It applies to new task and delivery orders issued after the modification’s effective date, including orders under existing BPAs. Earlier orders stay under their original terms.

Does the new AI clause apply to every MAS contractor?
No. Clause 552.239-7001 applies only when the government is procuring an LLM or similar system where LLM functionality is a material feature and Government Data is submitted to it. It is self-deleting for internal contractor tools the government does not access.

Which SINs change in Refresh 34?
Two. SIN 561210FAC removes the HVAC Maintenance subgroup and narrows standalone service offerings. SIN 54151HACS phases out the voluntary Incident Response subgroup at the end of Fiscal Year 2027.

Also Read: GSA MAS Refresh 33: What Changed and What Contractors Should Do

Key Takeaways

  • GSA MAS Refresh 34 must be accepted within 90 days of issuance, and it applies to new orders, including BPA calls.
  • Wave 4 removes the 20-year contract cap, deletes 41 clauses, and adds five new GSAR clauses.
  • Sales criteria, CTAs, audits, cancellation, and pricing data removal all have new contract language.
  • The AI clause applies only to LLM procurements and carries a 72-hour reporting duty.
  • Resellers need manufacturer authorization, with 30 days to answer a GSA discrepancy notice.
  • Two SINs change: 561210FAC and 54151HACS.

Reading 17 consolidated clauses against your own pricing, sales, reseller, and AI practices takes time most contractors do not have. iQuasar’s GSA Multiple Award Schedule team can review your Refresh 34 modification, flag the clauses that affect you, and prepare your acceptance. Set up a meeting before your acceptance window closes.

Talk To Our Expert

Share

Subscribe To Our Newsletter


Skip to content